A Tribune Tower condo renovation at 435 N Michigan, in progress
Demolition December 1
Updated 2026-11-02. This page is updated as the job moves; the design images will be joined by real photos as the work happens, and the finished rooms at completion.
What we're building inside one of Chicago's most recognized towers
Tribune Tower went from newspaper headquarters to 162 condos in a landmark conversion. This residence gets arches, plaster, walnut and hand-painted art, in a building with strict rules on hours, inspections and heavy fixtures. It's the kind of work we do across Streeterville condo remodeling and Chicago condo remodeling. These are the real design drawings. Real progress photos follow, then the after.
Approved by management within 4 weeks
A landmark tower doesn't take a contractor's word for anything. It's the same process behind all our high-rise condo remodeling, and the permit and building approval steps are worth reading first. Assembly Squad Remodeling sent a full package: scope, drawings, trades and licenses, insurance certificates, and a plan for protection, the freight elevator and debris, written to the building's own rules. Management approved it within 4 weeks. Noise and elevator notices, a building deposit and a pre-construction meeting in the unit all come before the first day of demolition.
Three arches, cut into one wall
The most ambitious wall in the unit: 11'-6" wide, with three 40-inch arched openings on a 20-inch radius, finished in plaster inside and out. The left arch is a walnut bench with a slat panel, the center an open niche, the right a walnut cabinet with a stone top. Each one backs onto a landscape mural, with LED hidden under the shelves.


A painted ceiling the second you walk in
A foyer of 6'-4" by 8'-6" with a 9-foot ceiling gets a new tray, cove LED around the edge and a double-tier crystal rod chandelier in brushed brass, 24 inches across. An outside artist paints the tray by hand; we build and prime it. A built-in bench with shoe storage and hooks goes along the wall. Tribune Tower reviews ceiling fixtures over 35 lb, so fixture weights get checked before any box goes up.
Sage tile, a painted landscape and a walnut vanity that curves
A full gut. Sage green 4x16 Zia tile stacks vertically to the ceiling around the tub, over a sand and blush crescent-pattern floor. The vanity wall carries a landscape mural wallcovering, a 42-inch fluted walnut wainscot, a sculpted walnut vanity with a travertine vessel sink and an oval backlit mirror. Fixtures are brushed brass throughout. This is the full gut in the job, so the building's inspection before close-in matters most here.


Venetian plaster, walnut and a chandelier over the tub
Every wall gets Venetian plaster, coated and burnished by hand. A 5-foot clear wall gets a 10-inch walnut slat panel with concealed LED, three floating walnut shelves and a marble-look wallcovering. A tiered crystal chandelier hangs centered over the tub, at the height the wet-location and clearance rules allow.

Navy cranes, brass and a stone vanity
A small room with the loudest finish in the unit. Navy and gold crane wallpaper above a painted wainscot at 3'-6", on every wall. A natural stone vanity on a brushed brass base, an arched mirror, marble sconces at 60 inches and a tiered crystal chandelier centered on the room.


The quiet work that makes it livable
The kitchen keeps its layout and gets brass pulls throughout, plus a custom pantry: five walnut pull-outs on 100 lb soft-close slides, sized to the actual door opening. The office and mudroom get custom cabinetry: matte lacquer with brushed brass hardware, a stone desk top, and in the mudroom a light oak slat wall, a stone bench and lit shoe shelves. Electrical is roughed in first so every piece lands where it's drawn.

What's actually going in
The second bath takes Zia sage green tile in a 4x16 vertical stack and Zia's crescent-pattern floor in sand and blush, with Benjamin Moore Saybrook Sage on the side walls in an eggshell finish. The foyer ceiling surround is Benjamin Moore Simply White. Shelves and built-ins run walnut across the unit, so the dining arches, the primary bath slat wall and the pantry read as one hand. Hardware and fixtures are brushed brass, with one exception: the chandelier over the primary tub is polished chrome. The dining wall finishes in plaster or limewash, and shelves get concealed LED channels with driver access planned before the walls close.
How a job like this runs in a working tower
Week one is protection and demolition: floors, the hallway and the elevator lobby get covered, and debris goes out on a reserved freight elevator. Next comes framing for the arches, the tray ceiling and the bath niche, then plumbing and electrical roughs. The building inspects the open walls before anything is covered. Drywall and cement board follow, then skim coat, then the bath tile. Work stops for the holidays and the unit stays locked. January is the slow, beautiful part: plaster coats, the foyer ceiling painting, cabinetry coming up the freight elevator, built-ins scribed to the walls. Countertops are templated once the cabinets are set, wallpaper goes on after the first coat of paint, and fixtures go in last. Then a punch list with the owners and a final walk. Streeterville high-rises like this one reward that order, because a missed elevator booking or inspection costs days you can't get back. It's why we schedule each trade around the building's hours, not ours.
What does a condo renovation like this cost in Chicago?
This page doesn't publish this job's number. These are the ranges from our Chicago condo remodeling cost guide:
- Full condo renovation: $60,000 to $150,000 or more
- Complete gut of a unit: $100,000 to $200,000 or more
- Kitchen: $25,000 to $85,000
- Bathroom: $15,000 to $45,000
High-rise condos typically run 15 to 25% more than low-rise, because of restricted hours, elevator booking and stricter rules. Custom plaster, built-ins and hand-painted work sit at the higher end.
What's included in this Tribune Tower renovation?
Six work zones over 10 weeks, sequenced around the building's rules.
Dining room
- Three plaster arches, 40 inches each
- Walnut bench, shelves and cabinet
- Landscape mural on the rear walls
- Concealed LED under shelves
Foyer
- New tray ceiling with cove LED
- Hand-painted ceiling by an outside artist
- Crystal rod chandelier, brushed brass
- Built-in bench and shoe storage
Second bath, full gut
- Sage Zia tile to the ceiling
- Crescent-pattern floor tile
- Mural wall and fluted walnut wainscot
- Sculpted walnut vanity, travertine vessel
Primary bath
- Venetian plaster, every wall
- Walnut slat panel and floating shelves
- Crystal chandelier over the tub
Powder room
- Crane wallpaper above wainscot
- Painted wainscot at 3'-6"
- Stone and brass vanity, marble sconces
Kitchen, office, mudroom
- Brass hardware throughout
- Five walnut pantry pull-outs
- Custom office and mudroom cabinetry
What should you know before renovating at Tribune Tower?
How long does Tribune Tower Residences take to approve a condo renovation?
Larger jobs go to the Board 30 days ahead, and the Board reviews on the first Wednesday of the month, so build that into your start date. This comes from the building's renovation guidelines dated March 2, 2026; confirm the current version with management. On this job, Assembly Squad Remodeling received management approval within 4 weeks.
What hours can contractors work at Tribune Tower?
Monday to Friday, 9 to 5, with power tools from 10 to 4 and no weekends, per the building's renovation guidelines dated March 2, 2026. On a 10-week job, that's why loud work and freight elevator time are scheduled in advance, and why a late delivery can cost a full day.
Does Tribune Tower inspect the work before walls are closed?
Yes. The guidelines call for an inspection before plumbing and electrical are closed in. This job has it on the schedule after the rough plumbing and electrical and before drywall, so nothing gets covered until the building has seen it. Plan your trades around that date.
Can I hang a heavy chandelier in a Tribune Tower condo?
Ceiling fixtures over 35 lb need a structural review under the building's guidelines. This unit has several chandeliers, including one in the foyer and one over a tub, so fixture weights get checked before the rough electrical, not after the boxes and supports are already closed in.
Can you add arches or built-ins inside a Tribune Tower condo?
This design does, with three 40-inch arched niches on one dining wall. Layouts differ across the building's 162 residences, so it starts with what is behind your wall. The drawings go to management with the rest of the package, and the framing is inspected with the roughs.
What does a Tribune Tower condo renovation cost?
This page doesn't publish this job's number. Our Chicago condo remodeling cost guide puts a full condo renovation at $60,000 to $150,000 or more, with high-rises typically 15 to 25% higher. We can price your unit after a walk-through at Tribune Tower.
More in Streeterville
Planning a remodel nearby?
See how we work in Streeterville, or look at another project close by.
Next door: River North condo remodeling
Planning a renovation at Tribune Tower?
We know the building, its rules and its process. Book a private consultation at your unit or our Lincoln Park studio. More in the neighborhood: 111 E Chestnut and 680 Lake Shore Dr.