Home/Portfolio/Streeterville/111 E Chestnut St — Streeterville Condo Kitchen and Bath Remodel
Design renderingBlack flat-panel base cabinets, white gloss uppers and a veined white quartz counter and backsplash running through a pass-through to the living room, kitchen design for an Elysees condo at 111 E Chestnut St, Streeterville Chicago

An Elysees condo renovation at 111 E Chestnut, in progress

To Dec 2026On site

Streeterville · 60611 · In progress · updated 2026-11-02

Portfolio · Streeterville

111 E Chestnut St

High-rise condo, Elysees · Near North Side · 60611
StatusIn progress · On site
ScopeKitchen and bathroom
TimelineStarted September 24, 2026, handover planned December 2026
BuildingFloor inspected before tile
Warranty2-Year Workmanship
Black bases under white handleless uppers
One quartz slab through to a seated bar
Pink tile, marble mosaic, black wallpaper
Floor sound-rated and inspected before tile
Book a Consultation → (312) 544-9150
Live · Progress log

On site

Updated 2026-11-02. This page is updated as the job moves; the design images will be joined by real photos as the work happens, and the finished rooms at completion.

Sep 24Demolition: kitchen and bathroom taken down, debris out by service elevator.
Sep 28Electrical and plumbing roughs, with water shut-offs through Building Engineering.
OctRough plumbing and electrical inspected and passed. Walls closed, cement board and waterproofing in.
Oct 27Pink wall tile, niche and the marble mosaic floor set in the bathroom.
Nov 30Cabinetry comes up the service elevator (working date).
DecTemplate, quartz counters and backsplash, appliances, trim and punch list.
Dec 22Planned final walkthrough and handover.
The building

What is the Elysees, and why do its rules matter?

The Elysees is a 56-story condominium tower at 111 E Chestnut, completed in 1972 and designed by Solomon, Cordwell, Buenz and Associates. It sits in Streeterville at the edge of the Gold Coast, steps from Michigan Avenue. A concrete tower from that era rewards careful work: tools and materials move by service elevator only, water shut-offs go through Building Engineering, and hard floors have their own sound rule. It is the kind of job behind our Streeterville condo remodeling and Chicago condo remodeling work, and also close to our Gold Coast condo remodeling pages.

The kitchen

White over black, with the veining carried up the wall

The old kitchen had white cabinets, a stepped row of uppers and a small window through to the living room. Gabriella drew flat-panel black bases with no hardware under smooth white uppers in one level, and a veined white quartz with a full-height backsplash cut from matched slabs, so the pattern carries from the counter up the wall. The sink, range and dishwasher stay in place, which keeps the plumbing out of the building's risers.

BeforeWhite galley kitchen cabinets stepping low and high over a stainless sink with a gray glass backsplash, before remodel
Before: stepped uppers, a gray backsplash.
DesignDesign rendering of a kitchen wall with white gloss uppers, black lowers, a black refrigerator and a veined quartz backsplash behind a black faucet
Design: one level of uppers, the slab up the wall.
ProgressKitchen stripped to painted walls with capped supply lines and a new white porcelain floor with small black inserts
October: walls painted, new floor down, waiting for cabinets.
The bar

A small window becomes a bar you can sit at

This is the biggest change to the room. The design takes the old sill down to counter height and joins it to the kitchen counter, so one quartz slab runs from the kitchen through the opening and out over the living room as a seated overhang, with the wall cut back so stools tuck under. How far a wall can come back in a tower like this can only be settled once it is opened and reviewed, so that review came before anyone committed to a width.

BeforeWhite kitchen cabinets and a quartz counter beside a small pass-through window with a deep sill, before remodel
Before: a modest window with a deep sill.
DesignDesign rendering of a black range and black base cabinets with a veined quartz counter running through a wide opening into the living room
Design: the counter carried through as a bar.
The kitchen floor

Why does the floor here take so much work?

This building holds a tile floor to a sound rating of IIC 55 on its 8-inch slab with no ceiling below, and management inspects the underlayment before any tile goes down. A thin peel-and-stick mat will not reach that. Nothing may be fastened through the mat, and every wall gets a perimeter isolation gap. Under the tile here is a sound-rated assembly chosen against the building's rules, with the porcelain laid out and leveled by hand. Our Chicago condo flooring sound rules guide explains why it matters.

ProgressWhite porcelain kitchen floor tile with small black diamond inserts being laid with orange leveling clips and a straightedge
October: the porcelain going down with leveling clips.
Behind the walls

What was inside the 1972 walls?

Removing the old tub and the double vanity meant opening the wet walls, and that is where a tower from this era shows its age. We opened them early, at the start of the bathroom, with the water shut down through Building Engineering, so anything found could be handled while there was still schedule left. New valves and supply lines went in with the fixtures in their existing locations, and the rough plumbing and electrical were inspected and passed before the walls closed.

ProgressOpened bathroom wall showing cast iron and copper building lines behind steel studs above a bare floor
September: the wall open, the building's lines exposed.
ProgressOpen wet wall with copper supply lines and steel studs in a stripped condo bathroom with insulation on the floor
September: new copper in the open wet wall.
The bathroom

Blush pink tile, a marble flower floor and black wallpaper

The bathroom had white square tile, a curtain on a rod and a slate floor. Gabriella's design is the opposite of plain: glossy blush pink tile stacked vertically to the ceiling around a new tub, a long niche, a floor of marble flower mosaic and black moody wallpaper behind crystal sconces. Behind the tile is cement board and a waterproofing membrane carried through the niche. The wall tile and the mosaic are in now, and the vanity, tall linen cabinet, mirror and lights come next.

BeforeWhite square tile tub surround with a shower curtain and a slate floor, condo bathroom before remodel
Before: white tile, a curtain, slate.
DesignDesign rendering of a tub surrounded by blush pink vertical tile with a long niche and a marble mosaic floor
Design: blush pink, a long niche.
ProgressBlush pink vertical stack tile to the ceiling around a covered tub with a long recessed niche
October: the tile up, the tub still protected.
The floor and the vanity wall

From dark slate to the design on the board

The old vanity wall ran a long white double vanity under a wall-width mirror, on a dark slate floor. The design replaces it with a floor-standing vanity with deep drawers, a tall linen cabinet, a rounded chrome mirror and the crystal sconces on black wallpaper. The floor is already done: a marble flower mosaic set tight enough that it reads as one pattern across the room.

BeforeLong white vanity with a stone top under a wall-width mirror beside a toilet on a dark slate floor, before remodel
Before: a long vanity, dark slate.
DesignDesign rendering of a white vanity and tall linen cabinet with a chrome mirror and crystal sconces on black wallpaper over a marble mosaic floor
Design: the vanity wall, on black wallpaper.
ProgressWhite and gray marble flower mosaic bathroom floor tile with small black hexagon inserts, freshly set
October: the marble mosaic floor set.
Protecting the building

How the job stays welcome in the building

Corridor protection goes up from the service elevator to the unit door before a tool comes out. The unit floors stay under Ram Board, dust is contained at the entry and the bathroom door, and debris leaves in bags by service elevator, never the chutes. The rest of the unit is being painted too, so the two new rooms do not sit inside a home that has not caught up with them.

ProgressLong condo corridor carpet covered in protective film from the service elevator to a unit door
Corridor film from the elevator to the door.
ProgressHigh-rise condo living room with protected floors, materials on site and tall windows over the Chicago skyline
The unit under Ram Board, with the view it is all for.
Chicago condo costs

What does a condo kitchen and bath like this cost in Chicago?

This page doesn't publish this job's number. These are the ranges from our Chicago condo remodeling cost guide:

  • Kitchen: $25,000 to $85,000
  • Bathroom: $15,000 to $45,000
  • Full condo renovation: $60,000 to $150,000 or more
  • Complete gut of a unit: $100,000 to $200,000 or more

High-rise condos typically run 15 to 25% more than low-rise, because of restricted hours, elevator booking and stricter rules.

Complete Scope of Work

What's included in this Elysees renovation?

From the signed scope of work, the final design and the schedule. Items below describe the plan until the job finishes.

Kitchen

  • All cabinets, counters, backsplash, sink, faucet, appliances, ceiling fixture and floor removed; tile lifted to the structural deck
  • Flat-panel handleless cabinetry, black bases and white uppers, one level of uppers, drawer-bank bases
  • Engineered quartz from two matched slabs: counter, full-height backsplash and the slab through to the bar
  • New undermount sink and pull-down faucet; the fixed section between refrigerator and dishwasher removed for a larger refrigerator
  • One-brand black appliance package: side-by-side refrigerator, electric range, dishwasher, over-range microwave
  • New ceiling fixture, under-cabinet LED and dimmers; GFCI at the counters; walls and ceiling painted

The Pass-Through Bar

  • Sill taken down to counter height and joined to the counter as one slab
  • Opening increased as far as the wall and the association allow, after an inspection opening and review
  • Overhang carried into the living room for stools, with the wall below cut back for knee room
  • Jambs, returns and head framed, boarded and finished square

Kitchen Floor

  • New porcelain tile throughout, with a separate decorative inset under the stool run
  • New subfloor and acoustic underlayment, rated to the building's standard before anything was ordered
  • Management inspection of the underlayment before tile, with one week's written notice
  • Perimeter isolation at walls, Schluter at edges, levels set to meet the next floor cleanly

Bathroom

  • Floor and surround tile removed to substrate, old tub hauled out, old vanity out in full
  • New tub in the existing alcove, set level on a bedded base, with new waste and overflow
  • Waterproofing behind the surround to current code, then blush pink tile to the ceiling and a long niche
  • Marble mosaic floor, black wallpaper, crystal sconces installed, new mirror and ceiling lighting
  • New floor-standing vanity with deep drawers, built-in tall storage, stone top and chrome faucet
  • Chrome valve and shower system with a filtration showerhead and spray nozzle; new exhaust fan tied to the building's exhaust

Plumbing and Electrical

  • Licensed Chicago plumber and electrician, fixtures reconnected at existing locations
  • New stops, supply lines, trap and drains; every joint pressure-tested, tub and shower flood-tested before tile
  • Range circuit and panel capacity checked before the appliances were chosen
  • Rough plumbing and electrical inspected and passed

The Building

  • Full approval package: scope, insurance certificates, trade licenses, photo survey, corridor protection plan
  • Service elevator only: Monday to Friday 7 AM to 9 PM, Saturday 7 AM to 5 PM, no Sundays
  • Water shut-offs through Building Engineering on the manager's written approval
  • Lead-safe work practices and dust containment for a 1972 tower
  • Painting through the rest of the unit: walls and ceilings
  • 2-year workmanship warranty in writing
500+Chicago projects since 2013
A+BBB rated
2-Yearworkmanship warranty
$2Mliability · IL #TGC098779
4.9★on Google
Common Questions

What should you know before renovating at the Elysees?

What sound rating does a tile floor need at 111 E Chestnut?

The building's construction rules hold a finished hard floor to IIC 55 on its 8-inch slab with no ceiling below. Two tile systems are pre-approved; anything else goes through a submittal with test data for a bare 8-inch slab. Management inspects the underlayment before tile, on one week's notice. See our condo flooring sound rules for why this comes before you choose a tile.

What happens if a floor at the Elysees fails its sound test?

A neighbor below can ask for an ASTM field test. If the floor fails, the owner pays for the test and has 60 days to tear the floor out and redo it. That is why a cheap mat is a false economy here, and why we fix the assembly and the inspection date on the schedule before any tile is ordered, instead of finding out later.

Can you open a pass-through wall in an Elysees condo?

Often, but only so far. A wall in a 1972 tower can hold risers, conduit or ductwork that cannot move, and you cannot know until it is opened. We open an inspection section and have it reviewed before any width is committed. If the review calls for a header, the achievable opening and its cost are documented and approved first, in writing. Nothing is cut without that.

How do deliveries and debris work at 111 E Chestnut?

Everything moves by the service elevator, booked ahead with management: Monday to Friday from 7 AM to 9 PM and Saturday from 7 AM to 5 PM, with no Sundays. Tools and materials never go through the Chestnut Street lobby, and debris goes out bagged, never by the chutes. Materials are stored inside the unit. We protect the corridor before the first tool comes out.

Does a condo kitchen and bath at the Elysees need a permit?

The building's approval package comes first: scope, insurance certificates, trade licenses, a photo survey and a corridor protection plan. Any City of Chicago permit the work calls for is handled by us under our Illinois general contractor license, and licensed trades do the plumbing and electrical. On this job the fixtures stayed in place and the rough work was inspected and passed before the walls closed.

How long does a kitchen and bathroom take at the Elysees?

This one started on September 24, 2026, with handover planned for late December. The bathroom runs first and the kitchen waits for its cabinets, which are the longest lead, then counters and appliances follow in December. There is no work on the holidays. The page updates as the job moves, and we also build this way across high-rise condo remodeling in Chicago.

More in Streeterville

Planning a remodel nearby?

See how we work in Streeterville, or look at another project close by.

Streeterville condo remodelingHigh-rise rules, approvals and what to expectStreeterville kitchen remodelingKitchens in Streeterville high-rises
Design rendering of a condo dining room with three plaster arches at Tribune TowerIn progress · Design

Tribune Tower, 435 N Michigan

Follow the project →
Open concept condo kitchen with quartz countertops at 111 E ChestnutCompleted

111 E Chestnut, open kitchen

See the project →

Next door: Gold Coast condo remodeling

Start Your Project

Own at the Elysees or anywhere in Streeterville?

See our earlier remodel in this same building and the Tribune Tower renovation too. Start with a private consultation at your home, at our Lincoln Park design studio, or online. We handle the building package, draw every room before anything is ordered, and hold a fixed price.

Book a Consultation → Call (312) 544-9150
Assembly Squad Remodeling, LLC · Illinois GC License #TGC098779 · EPA Lead-Safe Certified · A+ BBB · Rated 4.9★ on Google · 500+ projects since 2013
111 E Chestnut St · Streeterville · Chicago, IL 60611 · (312) 544-9150 · Condo remodeling Chicago
Assembly Squad
Remodeling

Chicago's boutique design-build remodeling company since 2013. Kitchen, bathroom, condo, basement, and whole-home renovations across Chicago and the North Shore.

IL #TGC098779
A+ BBB
NARI Chicago
NKBA Member
EPA Lead-Safe
$2M Insured
★ 4.9 on Google · Read our reviews

Services

  • Kitchen Remodeling
  • Bathroom Remodeling
  • Condo Remodeling
  • Basement Remodeling
  • Whole House Remodeling
  • Attic Conversions
  • Custom Cabinets
  • Design-Build Studio

Explore

  • About Us
  • All Services
  • Project Portfolio
  • Service Areas
  • Kitchen Remodel Cost
  • North Shore
  • Blog
  • Contact Us

Contact

Phone(312) 544-9150
Headquarters205 N Michigan Ave, Suite 810
Chicago, IL 60601
Lincoln Park Studio2315 N Southport Ave
Chicago, IL 60614

Mon–Fri 9–6 · Sat 10–4

Chicago Neighborhoods

Lincoln Park · Gold Coast · River North · Lakeview · Wicker Park · West Loop · Bucktown · Logan Square · + more →

North Shore

Winnetka · Lake Forest · Highland Park · Evanston · Wilmette · Northbrook
Assembly Squad Remodeling LLC · All Rights Reserved ©2013–2026 · IL License #TGC098779 · A+ BBB · NARI Chicago
Privacy Policy Get a Free Estimate
  • Home
  • About Us
  • Services
  • GET FREE ESTIMATE
  • Portfolio
  • Service Area
  • Blog