111 E Chestnut Condo Remodel — Open Concept Wall Removal Streeterville Kitchen & Bathroom $55K 2026
This 111 E Chestnut open concept wall removal Chicago project shows how a single structural decision transforms a Streeterville condo — wall removal for open concept unlocks the entire renovation. I'm Viktor Aharon with Assembly Squad Remodeling LLC — we've completed 500+ renovations since 2013 (IL License #TGC098779, A+ BBB), with deep experience in Streeterville condo remodeling and high-rise coordination throughout Chicago 60611.
The 111 E Chestnut unit had a classic problem: a closed kitchen that didn't fit how the client lived or how the building's competition was showing. Streeterville renters and buyers touring this building are also looking at new construction with open-concept kitchens. A closed kitchen is a direct price concession. The renovation plan was clear: open the kitchen, update both spaces to modern standards, and handle the bathroom gut properly.
Wall Removal Streeterville Condo — Open Concept Wall Removal Chicago Assessment First
Every open concept kitchen Streeterville project starts the same way: identifying whether the wall is bearing or non-bearing. We opened the wall carefully, inspected the framing, confirmed non-bearing status, and proceeded with removal and rebuild. Professional framing and drywall work followed — not just drywall patches, but structural integration that looks and performs as if the wall was never there. The electrical was rerouted cleanly; the ceiling and flooring transitioned seamlessly. The resulting space is dramatically different: natural light crosses the entire floor plate, the kitchen is visually integrated with the living area, and the unit reads as significantly larger than its square footage suggests.
Streeterville Kitchen Remodeling 60611 — Quartz, Backsplash, Full Electrical
With the wall open, the kitchen renovation proceeded: premium quartz countertops Chicago 60611 as the surface anchor, custom backsplash installation, complete electrical upgrade with modern outlets, dedicated circuits, and updated panel connections. All existing appliances professionally disconnected, reconnected, and tested. The combination of open concept layout + quartz countertops is the standard for competitive Streeterville kitchen remodeling — it's what this market requires and what this renovation delivers.
High-Rise Condo Remodel Streeterville — Bathroom Gut Waterproofing Non-Negotiable
The bathroom renovation at 111 E Chestnut was a complete gut: tub removed, all tile removed, new drywall with state-of-the-art waterproof insulation behind every surface that contacts water. This matters especially in a Streeterville high-rise — moisture migration in a condo building is a shared-wall problem that triggers building management involvement and potential liability. The new installation: modern bathtub, quality bathroom flooring, custom vanity, new toilet, all accessories. Built to last and built to prevent the moisture issues that cut corners create in high-rise environments.
Complete Scope of Work
- Structural assessment and non-bearing wall removal — 111 E Chestnut Streeterville
- Professional framing and drywall — seamless integration of open concept space
- Premium flooring throughout kitchen and living areas
- Complete electrical upgrade — modern outlets, dedicated circuits, new switches
- Quartz countertop fabrication and installation
- Custom backsplash design and installation
- Professional appliance disconnection, reconnection, and testing
- Complete bathroom gut — tub, tile, and drywall removed
- State-of-the-art waterproof insulation system behind all wet surfaces
- New bathtub, flooring, custom vanity, toilet, and accessories
- All Streeterville building management coordination and permits handled
- Elevator scheduling, noise restrictions, neighbor notification managed
- $55,000 total — completed in 5.5 weeks
Streeterville Condo Renovation Cost 2026 — $55K Benchmark
Total: $55,000 in 5.5 weeks. This is a realistic benchmark for a Streeterville condo remodel cost 2026 covering kitchen wall removal, open-concept kitchen renovation, quartz countertops, bathroom gut with proper waterproofing, and all building coordination. Rough breakdown: wall removal and structural work ($4,000–$7,000), kitchen renovation with quartz ($18,000–$25,000), bathroom gut renovation ($14,000–$20,000), flooring ($5,000–$8,000), electrical ($4,000–$6,000), building coordination and permits ($3,000–$5,000). See our Chicago kitchen remodel cost guide → and our Streeterville home remodeling hub →