A Lakeview church condo remodel at 1036 W Barry, designed and starting now
Design signed, starting
Updated 2026-11-02. This page is updated as the job moves; the design images will be joined by real photos as the work happens, and the finished rooms at completion.
A parish house that became a home
This two-level condo is part of the former Trinity Lutheran parish house on West Barry, one of the church conversions that give this part of Lakeview its character. Curved ceiling lines and old hardwood are the reason people buy here, and also the reason a remodel has to be careful. It is the kind of work behind our Lakeview condo remodeling and Chicago condo remodeling pages. Our condo renovation permission guide covers the paperwork side.
A long galley, opened to the dining side
The galley runs about 26 feet, with white slab cabinets, a mirrored backsplash and a knee wall at the refrigerator that blocks the dining room light. The knee wall and the soffit above it come out, with water and gas capped by licensed trades, so the kitchen, dining room and balcony light read as one space. The footprint stays, the sink stays where it is and the hardwood stays, covered and protected.


Why does standard-size cabinetry look built in here?
Gabriella's design puts deep green lowers and a pantry under cream shaker uppers with glass fronts, warm brass pulls, a glazed 2-by-8 white backsplash and a pale stone counter, with warm LED under every cabinet and lit oak shelves. These are standard manufacturer sizes, not custom boxes. Fillers, end panels and careful scribing to the ceiling are what make them read as built-in, and the budget goes to the parts you touch. A storage wall and a window bench with drawers add the storage a galley gives away.


How do two tiny rooms become one real bathroom?
The primary bath is two rooms about 4 feet 9 inches deep, joined by a door: one with a pedestal sink and a toilet, one with a jetted tub and a builder vanity. No fixture fixes that, so the wall between them comes out. The walk-in shower is rebuilt on the wet wall the building already serves, the toilet moves to the center of the room with a licensed waste-line move, and a larger vanity goes on the old sink plumbing. Most of the money goes into tile and glass, not pipe runs.


White oak, soft stone and warm brass
The old side of the room becomes the quiet side: a floating white oak vanity with a stone top and an undermount sink, a large brass-framed mirror and two glass sconces on a warm white wall, over a large-format marble-look porcelain floor. The shower walls go in olive ceramic tile to the ceiling, with a marble pencil trim and a thin brushed gold edge at the niche, and a basketweave mosaic on the shower floor.

What gets checked before the walls come out?
Both walls are assumed non-bearing, and a structural engineer reviews and stamps both before either is touched. If a beam were ever needed it would be quoted first, in writing. The soffit may hide building services; if so, it becomes a minimal boxed bulkhead, decided once it is open. The hardwood under the knee wall and old cabinets gets inspected with the owners after demolition. The building predates 1978, so EPA lead-safe practices apply to every painted surface we disturb. Licensed trades cap the gas and leak-test the range.
What does a condo kitchen and bath like this cost in Chicago?
This page doesn't publish this job's number. These are the ranges from our Chicago condo remodeling cost guide:
- Kitchen: $25,000 to $85,000
- Bathroom: $15,000 to $45,000
- Full condo renovation: $60,000 to $150,000 or more
- Complete gut of a unit: $100,000 to $200,000 or more
High-rise condos typically run 15 to 25% more than low-rise, because of restricted hours, elevator booking and stricter rules.
What's included in this Lakeview condo remodel?
From the signed scope of work and the signed design. Items below describe the plan until the job finishes.
Kitchen: Opening It Up
- All cabinets on both runs, counters, mirrored backsplash and appliances removed
- Knee wall at the refrigerator removed, water and gas capped by licensed trades
- Ceiling soffit removed, or a minimal bulkhead if it hides building services
- Hardwood kept and protected with floor protection and zip walls, inspected together after demolition
Kitchen: The New Room
- New standard-size soft-close cabinetry with fillers, toe kicks and end panels, scribed to the curved ceiling line
- Extended lower run, a full-height storage wall with lit open shelving and a coffee landing
- Built-in window bench with storage drawers, pantry, garbage and recycling pull-out, microwave set into cabinetry
- New stone counters on both runs, undermount sink and faucet at the existing location, glazed backsplash, new range hood
- Four-piece appliance package installed, gas range reconnected and leak-tested, refrigerator water line
- LED in the storage wall, shelves and under-cabinet; hood circuit; GFCI to current Chicago code
Primary Bath: The Layout
- Both rooms taken to the studs: jetted tub, vanity, pedestal sink, toilet, mirrors and all tile out
- Dividing wall removed to make one open bathroom, with a stamped engineer's review
- Walk-in shower rebuilt on the existing wet wall
- Toilet moved to the center by a licensed plumber, final position confirmed on site
- Larger vanity on the old sink plumbing, every line pressure-tested before any wall closes
Primary Bath: The Finishes
- Sloped shower pan, full waterproofing, 24-hour flood test before tile
- Olive ceramic tile to the ceiling, recessed niche with thin brushed gold trim, marble pencil trim, basketweave shower floor
- Glass shower door, damp-rated recessed light over the shower
- Large-format porcelain floor through the combined room
- Floating white oak vanity, stone top, undermount sink, mirror and two sconces
- Warm brass fixtures, comfort-height toilet, paint
The Building and the Paperwork
- Association paperwork and insurance certificates prepared by us; City permits under our license
- Structural engineer's stamped review of both wall changes
- EPA lead-safe practices on every painted surface disturbed in a pre-1978 building
- Stairs and path protected daily, debris bagged and carried out by hand
- Daily site photos for the owners and one group text
- 20-point inspection with run-water tests, then a 2-year workmanship warranty in writing
What should you know before remodeling a Lakeview church conversion?
Can you remove a wall in a Lakeview church conversion condo?
Often, but it starts with a structural engineer, not a saw. On this job both wall changes are assumed non-bearing, and an engineer reviews and stamps them before either is touched. If a beam were required it would be quoted first, in writing. Old conversions can hide surprises, so soffits are opened and judged on site, and the association's written OK comes before the start.
How do you join two small bathrooms into one in a Lakeview condo?
You take out the wall between them and keep the plumbing close to where it already runs. Here the shower stays on the existing wet wall and the vanity uses the old sink plumbing. Only the toilet moves, with a licensed waste-line change. That makes it mostly carpentry and finishes, so more of the budget lands in tile and glass. See our Lakeview bathroom remodeling page.
Do lead rules apply to a remodel at 1036 W Barry?
Yes. The building predates 1978, so EPA lead-safe practices apply to every painted surface disturbed, including both walls, the soffit and surface prep. That means containment, careful cleanup and a signed acknowledgment from the owners before work starts. Any abatement beyond standard lead-safe work is separate, and it would be documented and approved in writing before anything proceeds.
Can standard-size cabinets fit under a curved ceiling line?
Yes, with care at the edges. Standard manufacturer boxes run below a ceiling line that is not straight, and fillers, end panels and scribing close the gap so the run reads as built-in. It keeps custom millwork pricing and long lead times out of the job. In this Lakeview kitchen it pays for a storage wall, a window bench and a pantry instead.
What happens to old hardwood during a Lakeview kitchen remodel?
It stays and gets covered from the entry to the work rooms, with zip walls around both rooms. Once the knee wall and old cabinets are out, we walk the exposed floor with the owners. If boards under them need replacing, the repair and stain are photographed and approved by written change order first. A full refinish is its own option, not something that happens by surprise.
How long does a condo kitchen and bath take in Lakeview?
This one plans about six weeks on site: protection on November 6, demolition from November 9, cabinets on November 30 and a walkthrough on December 17, with days held in reserve before the holidays. There is no work on Thanksgiving Thursday or Friday. The cabinets set the start date, so nothing begins until they are on site. This page updates as the job moves.
Remodeling a condo in Lakeview?
See the 456 W Briar condo and the 3054 N Sheffield condo too. Start with a private consultation at your home, at our Lincoln Park design studio, or online. We handle the building paperwork, draw every room before anything is ordered, and hold a fixed price.
Book a Consultation → Call (312) 544-91501036 W Barry Ave · Lakeview · Chicago, IL 60657 · (312) 544-9150 · Condo remodeling Chicago