A Regatta condo renovation at 420 E Waterside, in progress
On site
Updated 2026-11-02. This page is updated as the job moves; the design images will be joined by real photos as the work happens, and the finished rooms at completion.
A kitchen, three baths and new floors in a Lakeshore East tower
The Regatta rises on East Waterside Drive in Lakeshore East, with the river and the lake close by. This renovation rebuilds the kitchen, adds a dry bar, takes three bathrooms to the studs and replaces the floors, the molding, the paint and the trim. It's the kind of work behind our Lakeshore East condo remodeling and Chicago condo remodeling. These are the real design drawings. Real progress photos follow, then the after.
The Regatta's rules shape every day of this job
Work runs Monday to Friday, 8 to 5 for this job. Everything comes through the loading dock at the garage level, never the lobby, and every delivery and debris run on the one freight elevator is booked with the front desk first. Debris leaves in covered containers or tied bags, dust is vacuumed daily, and the balcony stays untouched. The building engineer inspects open walls before drywall. That's how our high-rise condo remodeling works, and our condo remodeling permits guide covers the approval steps.
Milk oak up, gloss white down, stone all around
Milk oak uppers sit over gloss white lowers with brushed gold pulls. Calacatta Carmelo runs across the counters and up the backsplash in a polished finish, wrapping down the end of the peninsula. A Kohler faucet and built-in soap dispenser sit at the sink, with pull-outs for oils and every inch of the layout used for storage. LED under the uppers warms the stone. See more of our Chicago kitchen remodeling.


A wine wall built into the plan
The dry bar stacks milk oak uppers over two glass shelves against a slab of Calacatta Carmelo, with gloss white drawers and a wine refrigerator below. Light runs only under the upper cabinet, so the glass stays clean and the stone does the work.

Gold-veined porcelain, a floating vanity and an open tub
Large 24 by 48 MSI Miraggio Gold porcelain runs polished on the walls and matte on the floor. A floating milk oak double vanity with lit toe space carries a stone-look quartz top, framed mirrors and vertical sconces, with a recessed display niche on each side. A freestanding tub sits behind frameless glass, with a floor-mounted filler, ceiling shower, linear drain and hexagon mosaic. Fixtures are brushed gold, and the floor is heated.

One calm, one dark and dramatic
The guest bath wraps in polished onyx-look 24 by 48 porcelain with a white penny round shower floor, a floating milk oak vanity, frameless glass and a heated floor. The powder room goes the other way: deep navy walls over a stone-look wainscot, a navy floating vanity, brushed gold mirror and sconces, and a glass globe chandelier. Our Chicago bathroom remodeling page covers this kind of work.


Quiet floors, the way the building requires
The old cherry floors come up and engineered oak goes down. The Regatta's flooring rider asks for the whole floor system to rate IIC/FIIC 51 or better, on cork or rubber underlayment that is never fastened to the slab, with perimeter isolation and sealant. Any leveling fill gets the building rep's inspection first. Old applied molding comes off, with new doors, baseboard and casing throughout. Our Chicago condo flooring sound rules guide explains how this works.
Why paint goes on before the floor
Baths and kitchen come out first so the plumber and electrician can start early. Walls stay open until the engineer has seen them. Then the baths close and tile, and the painter primes and first-coats before the floor goes down, so no roller ever gets near new oak. Floors go in, then doors, trim, built-ins and vanities. Kitchen cabinets arrive late because they're the longest lead, stone is templated off them, and the final coat goes on with everything in place. Then a clean, a holiday pause, a punch list, a final building inspection and handover.
What does a condo renovation like this cost in Chicago?
This page doesn't publish this job's number. These are the ranges from our Chicago condo remodeling cost guide:
- Full condo renovation: $60,000 to $150,000 or more
- Complete gut of a unit: $100,000 to $200,000 or more
- Kitchen: $25,000 to $85,000
- Bathroom: $15,000 to $45,000
High-rise condos typically run 15 to 25% more than low-rise, because of restricted hours, elevator booking and stricter rules.
What's included in this Regatta renovation?
Kitchen, baths and finishes, sequenced around the building's rules.
Kitchen
- Milk oak uppers, gloss white lowers
- Calacatta Carmelo counters and backsplash
- Pull-outs and under-cabinet LED
Dry bar
- Glass shelves on a stone backsplash
- Wine refrigerator
- White drawers, milk oak uppers
Primary bath
- Floating double vanity
- Freestanding tub and frameless glass
- Heated floor, display niches
Guest bath
- Onyx-look porcelain
- Penny round shower floor
- Heated floor, floating vanity
Powder room
- Navy walls and floating vanity
- Stone-look wainscot
- Globe chandelier, gold fixtures
Whole unit
- Cherry floors out, engineered oak in
- Sound-rated underlayment
- New doors, trim, paint, laundry cabinetry
What should you know before renovating at The Regatta?
What hours can contractors work at The Regatta?
Per the building's rules and regulations handbook, Monday to Friday from 8 to 5, with limited weekend hours from 12 to 5. Working outside those hours brings a fine. We don't work weekends. Contractors sign in at the front desk daily, so confirm the current rules with management before you schedule.
How do materials get into The Regatta?
Everything goes through the loading dock at the garage level on Lower Wacker, never through the lobby or on passenger elevators. Each delivery and debris run on the freight elevator is booked with the front desk first. Vehicles can't stay at the dock, so crews plan parking and deliveries before the first day.
What flooring does The Regatta require?
Its Hard Surface Flooring Rider asks for the complete floor system to rate IIC/FIIC 51 or better. Cork or recycled rubber underlayment can be adhered or loose-laid but never fastened to the slab, with perimeter isolation foam and acoustical sealant. Leveling fill needs an inspection, and management wants written notice before flooring work starts.
Does The Regatta inspect renovation work?
Yes. The building engineer inspects open walls before drywall goes up, and this job schedules a final inspection before handover. Keep the walls open until that sign-off and photograph everything the same day. Plumbing problems found during demolition get reported to management right away, so plan your trades around those visits.
Can I replace my washer and dryer at The Regatta?
Replacing them rather than reinstalling them takes its own written approval from management, plus an inspection by the building engineer. Treat it as a separate item in your plans and raise it early. The rules also say no change to approved plans happens without written approval from management, so include it from the start.
What does a Regatta condo renovation cost?
This page doesn't publish this job's number. Our Chicago condo remodeling cost guide puts a full condo renovation at $60,000 to $150,000 or more, with high-rises typically 15 to 25% higher. We can price your unit after a walk-through at The Regatta.
Planning a renovation at The Regatta?
We know the building, its rules and its process. Book a private consultation at your unit or our Lincoln Park studio. More nearby: 450 E Waterside and Tribune Tower.
Book a Consultation → Call (312) 544-9150420 E Waterside Dr · Lakeshore East · Chicago, IL 60601 · (312) 544-9150 · Condo remodeling Chicago