
A Newberry Plaza bathroom remodel in the Gold Coast, in progress
Tile going up
Updated 2026-11-02. This page is updated as the job moves; the design images will be joined by real photos as the work happens, and the finished rooms at completion.
Why does a bathroom at Newberry Plaza take a different plan?
Newberry Plaza is a high-rise at 1030 N State St in the Gold Coast, and we have worked here before. A bathroom in a stacked tower is the room where a mistake reaches the neighbors below. Work runs inside the building's set hours, materials and debris move on reserved elevator time, and the building's remodeling rules and insurance paperwork are settled before demolition. On this job, we filed the construction package for the owners, who live out of state.
A layout that works, and everything inside it worn
The room had gray shower tile, a framed glass door, a dark stained vanity and a builder-grade mirror. The layout itself worked. So the plan keeps the footprint and the plumbing locations, which controls cost, and rebuilds everything inside them.


Designed virtually, approved before anything was ordered
The owners live out of state, so we measured on site once and ran the design with them online, with real samples and renderings. They chose a warm walnut vanity, a Calacatta quartz top and matching backsplash, a rectangular undermount sink, and black fixtures with a black framed mirror. The existing vanity light stays, centered over the new mirror.


Down to the studs, with the plumbing kept where it was
The shower came down to the metal studs, and the old pan came out. Keeping the drain and supply locations meant no new runs through a concrete building. The vanity wall was opened for rough electrical. This is the stage where a building like this wants to see the open walls before anything closes.


The red walls are the part you never see again
Before tile, the shower walls get a liquid waterproofing membrane at every wet wall and transition, rolled on until the color is solid. The recessed niche and the valve are sealed too. On the floor, an uncoupling membrane goes down under the tile. In a high-rise this layer protects the unit below, which is why it gets more attention than any finish.



White tile, stacked straight
The walls are a glossy white subway tile set in a vertical stack, not a running bond, with a long recessed niche tiled to match. Stacking it straight draws the eye up and makes a small shower read taller. The shower floor and bathroom floor are still to come, then a sliding glass door in brushed nickel.



What does a condo bathroom like this cost in Chicago?
This page doesn't publish this job's number. These are the ranges from our Chicago condo bathroom remodel cost guide:
- Condo bathroom: $15,000 to $45,000
- Kitchen: $25,000 to $85,000
- Full condo renovation: $60,000 to $150,000 or more
- Complete gut of a unit: $100,000 to $200,000 or more
High-rise condos typically run 15 to 25% more than low-rise, because of restricted hours, elevator booking and stricter rules.
What is included in this Newberry Plaza bathroom?
From the signed scope of work and the final design. Items below describe the plan until the job finishes.
Demolition and Protection
- Vanity, top, sink, faucet, mirror, toilet and framed glass door removed
- All floor tile and shower wall tile removed to the substrate
- Old shower pan removed
- Protection from the unit entrance to the bathroom, with a dust barrier and daily cleanup
Plumbing and Electrical
- Same drain and supply locations
- New shower valve, trim and shower head
- New toilet, faucet and shut-offs
- Lines pressure-tested before close-in
- Every outlet, switch and dimmer in the bathroom replaced, by a licensed Chicago electrician
Shower Build
- New sloped shower base
- Cement board on the shower walls
- Liquid waterproofing at every wet wall and transition
- Recessed niche, waterproofed and tiled
- Glossy white subway tile in a vertical stack
- Sliding glass door in brushed nickel
Vanity and Finish
- 57-inch warm walnut vanity
- Calacatta quartz top, backsplash and side splash
- Rectangular undermount sink, black widespread faucet
- 48 by 30 inch black framed mirror; existing vanity light retained and centered
- New floor tile with matching grout
- Black towel bar and towel ring, paint, final clean
Building Coordination
- Construction package filed with the building
- Certificate of insurance
- Elevator reservation and working-hours compliance
- Weekly photo updates to the owners out of state
What should you know before remodeling a bathroom at Newberry Plaza?
Can owners living out of state remodel a bathroom at Newberry Plaza?
Yes. On this job the owners live out of state. We measured on site once and ran the design online, with real samples and renderings, so every selection was approved before anything was ordered. We filed the building package, reserved the elevator, and send weekly photo updates. They do not need to fly in to run the job or meet the trades.
Why keep the same layout in a high-rise bathroom at 1030 N State?
Keeping the drain and supply locations is what controls the budget in a concrete tower, because new runs are slow and tightly limited. This room already worked. The plan keeps the footprint and rebuilds everything inside it: tile, shower base, vanity, top, glass and fixtures. That money goes into finishes and waterproofing you actually use every day.
What is the red coating on the shower walls in these photos?
It is a liquid waterproofing membrane, rolled over the cement board at every wet wall and transition before tile goes on. Grout and tile are not waterproof on their own. In a stacked building, the sealed layer behind the tile is what protects the unit below, so it gets inspected and finished carefully before anything covers it up.
Why set subway tile in a vertical stack in a small shower?
A vertical stack draws the eye toward the ceiling, so a small shower reads taller than it would with a horizontal running bond. It also looks cleaner around a long recessed niche, because the grout lines stay straight. Here it is a glossy white tile, with a sliding glass door in brushed nickel keeping the view open.
What does a building like Newberry Plaza require before a bathroom remodel?
Expect a construction package for building review, insurance paperwork naming the association, a security deposit, reserved elevator time and set working hours. Rules here limit when work can run and how materials and debris move through the building. We prepare and file the package for the owners, then keep the schedule inside the rules the building sets for contractors.
How long does a full bathroom gut take at Newberry Plaza?
The plan for this bathroom is about three to four weeks on site, after design and materials are ready. In a tower, the real schedule also depends on building review, elevator reservations and each inspection of the open walls. This page is updated as the job moves, so you can see the actual sequence from demolition through final tile.
Own at Newberry Plaza or anywhere in the Gold Coast?
See our full condo remodel in this same building and 1010 N Lake Shore Drive and the 1242 N Lake Shore co-op too. Start with a private consultation at your home, at our Lincoln Park design studio, or online. We handle the building package and draw the room before anything is ordered.
Book a Consultation → Call (312) 544-91501030 N State St · Gold Coast · Chicago, IL 60610 · (312) 544-9150 · Condo remodeling Chicago