Design renderingDesign rendering of a white vertical stacked tile shower with a long niche and a sliding glass door in brushed nickel

A Newberry Plaza bathroom remodel in the Gold Coast, in progress

On site nowTile going up

Gold Coast · 60610 · In progress · updated 2026-11-02

Portfolio · Gold Coast

1030 N State St

High-rise condo, Newberry Plaza · Near North Side · 60610
StatusIn progress · Tile going up
ScopeFull bathroom gut
TimelineDemolition started October 2026
BuildingBuilding review, walls inspected before close-in
Warranty2-Year Workmanship
A full gut, on the same layout and plumbing locations
White vertical stacked tile with a long recessed niche
Waterproofed walls, then an uncoupling membrane on the floor
Designed virtually for owners living out of state
Book a Consultation → (312) 544-9150
Live · Progress log

Tile going up

Updated 2026-11-02. This page is updated as the job moves; the design images will be joined by real photos as the work happens, and the finished rooms at completion.

Oct 1Demolition starts. Vanity, toilet, glass door and all floor and shower tile come out, with the path to the bathroom protected.
OctoberRough plumbing and electrical. Valve set, wall opened at the vanity, and the building reviews the open walls before anything closes.
OctoberShower walls sealed with a liquid waterproofing membrane, and an uncoupling membrane laid across the bathroom floor.
NowWhite vertical tile going up on the shower walls around the niche. Shower base, floor tile, vanity and glass still to come.
The building

Why does a bathroom at Newberry Plaza take a different plan?

Newberry Plaza is a high-rise at 1030 N State St in the Gold Coast, and we have worked here before. A bathroom in a stacked tower is the room where a mistake reaches the neighbors below. Work runs inside the building's set hours, materials and debris move on reserved elevator time, and the building's remodeling rules and insurance paperwork are settled before demolition. On this job, we filed the construction package for the owners, who live out of state.

The room before

A layout that works, and everything inside it worn

The room had gray shower tile, a framed glass door, a dark stained vanity and a builder-grade mirror. The layout itself worked. So the plan keeps the footprint and the plumbing locations, which controls cost, and rebuilds everything inside them.

BeforeGray tile shower behind a framed glass door beside a dark stained vanity, condo bathroom before the remodel at Newberry Plaza
Before: gray tile, a framed door and a dark vanity.
DesignDesign rendering of a warm walnut vanity with a Calacatta quartz top, black faucet and a black framed mirror in a Gold Coast condo bathroom
Design: walnut vanity, Calacatta quartz, black frame mirror.
The design

Designed virtually, approved before anything was ordered

The owners live out of state, so we measured on site once and ran the design with them online, with real samples and renderings. They chose a warm walnut vanity, a Calacatta quartz top and matching backsplash, a rectangular undermount sink, and black fixtures with a black framed mirror. The existing vanity light stays, centered over the new mirror.

DesignDesign rendering of a white vertical stacked tile shower with a long niche and a sliding glass door in brushed nickel
Design: white vertical tile, one long niche, sliding glass.
DesignDesign rendering of a warm walnut vanity with a Calacatta quartz top, black faucet and a black framed mirror in a Gold Coast condo bathroom
Design: walnut vanity, Calacatta quartz, black frame mirror.
Demolition

Down to the studs, with the plumbing kept where it was

The shower came down to the metal studs, and the old pan came out. Keeping the drain and supply locations meant no new runs through a concrete building. The vanity wall was opened for rough electrical. This is the stage where a building like this wants to see the open walls before anything closes.

ProgressShower taken down to the metal studs and new plumbing lines at Newberry Plaza
The shower stripped to the studs.
ProgressBathroom wall opened for rough electrical above the vanity location
The vanity wall opened for rough electrical.
Waterproofing

The red walls are the part you never see again

Before tile, the shower walls get a liquid waterproofing membrane at every wet wall and transition, rolled on until the color is solid. The recessed niche and the valve are sealed too. On the floor, an uncoupling membrane goes down under the tile. In a high-rise this layer protects the unit below, which is why it gets more attention than any finish.

ProgressRed liquid waterproofing membrane rolled over the shower walls, around the drain and new valve
Liquid waterproofing over every shower wall.
ProgressWaterproofed shower wall with the valve set and the shower floor ready for its pan
The valve set, walls sealed, before tile.
ProgressOrange uncoupling membrane laid across the bathroom floor before floor tile
An uncoupling membrane on the floor, before tile.
Tile

White tile, stacked straight

The walls are a glossy white subway tile set in a vertical stack, not a running bond, with a long recessed niche tiled to match. Stacking it straight draws the eye up and makes a small shower read taller. The shower floor and bathroom floor are still to come, then a sliding glass door in brushed nickel.

ProgressWhite vertical stacked tile starting on a waterproofed shower wall with recessed niches
Vertical tile starts around the recessed niche.
ProgressGlossy white vertical stacked tile going up on the shower back wall
Glossy white tile going up, stacked straight.
ProgressShower walls tiled in white vertical stacked tile with a level across the shower base
Shower walls tiled, the base still to come.
Chicago bathroom costs

What does a condo bathroom like this cost in Chicago?

This page doesn't publish this job's number. These are the ranges from our Chicago condo bathroom remodel cost guide:

  • Condo bathroom: $15,000 to $45,000
  • Kitchen: $25,000 to $85,000
  • Full condo renovation: $60,000 to $150,000 or more
  • Complete gut of a unit: $100,000 to $200,000 or more

High-rise condos typically run 15 to 25% more than low-rise, because of restricted hours, elevator booking and stricter rules.

Complete Scope of Work

What is included in this Newberry Plaza bathroom?

From the signed scope of work and the final design. Items below describe the plan until the job finishes.

Demolition and Protection

  • Vanity, top, sink, faucet, mirror, toilet and framed glass door removed
  • All floor tile and shower wall tile removed to the substrate
  • Old shower pan removed
  • Protection from the unit entrance to the bathroom, with a dust barrier and daily cleanup

Plumbing and Electrical

  • Same drain and supply locations
  • New shower valve, trim and shower head
  • New toilet, faucet and shut-offs
  • Lines pressure-tested before close-in
  • Every outlet, switch and dimmer in the bathroom replaced, by a licensed Chicago electrician

Shower Build

  • New sloped shower base
  • Cement board on the shower walls
  • Liquid waterproofing at every wet wall and transition
  • Recessed niche, waterproofed and tiled
  • Glossy white subway tile in a vertical stack
  • Sliding glass door in brushed nickel

Vanity and Finish

  • 57-inch warm walnut vanity
  • Calacatta quartz top, backsplash and side splash
  • Rectangular undermount sink, black widespread faucet
  • 48 by 30 inch black framed mirror; existing vanity light retained and centered
  • New floor tile with matching grout
  • Black towel bar and towel ring, paint, final clean

Building Coordination

  • Construction package filed with the building
  • Certificate of insurance
  • Elevator reservation and working-hours compliance
  • Weekly photo updates to the owners out of state
500+Chicago projects since 2013
A+BBB rated
2-Yearworkmanship warranty
$2Mliability · IL #TGC098779
4.9★on Google
Common Questions

What should you know before remodeling a bathroom at Newberry Plaza?

Can owners living out of state remodel a bathroom at Newberry Plaza?

Yes. On this job the owners live out of state. We measured on site once and ran the design online, with real samples and renderings, so every selection was approved before anything was ordered. We filed the building package, reserved the elevator, and send weekly photo updates. They do not need to fly in to run the job or meet the trades.

Why keep the same layout in a high-rise bathroom at 1030 N State?

Keeping the drain and supply locations is what controls the budget in a concrete tower, because new runs are slow and tightly limited. This room already worked. The plan keeps the footprint and rebuilds everything inside it: tile, shower base, vanity, top, glass and fixtures. That money goes into finishes and waterproofing you actually use every day.

What is the red coating on the shower walls in these photos?

It is a liquid waterproofing membrane, rolled over the cement board at every wet wall and transition before tile goes on. Grout and tile are not waterproof on their own. In a stacked building, the sealed layer behind the tile is what protects the unit below, so it gets inspected and finished carefully before anything covers it up.

Why set subway tile in a vertical stack in a small shower?

A vertical stack draws the eye toward the ceiling, so a small shower reads taller than it would with a horizontal running bond. It also looks cleaner around a long recessed niche, because the grout lines stay straight. Here it is a glossy white tile, with a sliding glass door in brushed nickel keeping the view open.

What does a building like Newberry Plaza require before a bathroom remodel?

Expect a construction package for building review, insurance paperwork naming the association, a security deposit, reserved elevator time and set working hours. Rules here limit when work can run and how materials and debris move through the building. We prepare and file the package for the owners, then keep the schedule inside the rules the building sets for contractors.

How long does a full bathroom gut take at Newberry Plaza?

The plan for this bathroom is about three to four weeks on site, after design and materials are ready. In a tower, the real schedule also depends on building review, elevator reservations and each inspection of the open walls. This page is updated as the job moves, so you can see the actual sequence from demolition through final tile.

Start Your Project

Own at Newberry Plaza or anywhere in the Gold Coast?

See our full condo remodel in this same building and 1010 N Lake Shore Drive and the 1242 N Lake Shore co-op too. Start with a private consultation at your home, at our Lincoln Park design studio, or online. We handle the building package and draw the room before anything is ordered.

Book a Consultation → Call (312) 544-9150
Assembly Squad Remodeling, LLC · Illinois GC License #TGC098779 · EPA Lead-Safe Certified · A+ BBB · Rated 4.9★ on Google · 500+ projects since 2013
1030 N State St · Gold Coast · Chicago, IL 60610 · (312) 544-9150 · Condo remodeling Chicago
Assembly Squad
Remodeling

Chicago's boutique design-build remodeling company since 2013. Kitchen, bathroom, condo, basement, and whole-home renovations across Chicago and the North Shore.

IL #TGC098779
A+ BBB
NARI Chicago
NKBA Member
EPA Lead-Safe
$2M Insured
★ 4.9 on Google · Read our reviews

Services

  • Kitchen Remodeling
  • Bathroom Remodeling
  • Condo Remodeling
  • Basement Remodeling
  • Whole House Remodeling
  • Attic Conversions
  • Custom Cabinets
  • Design-Build Studio

Explore

  • About Us
  • All Services
  • Project Portfolio
  • Service Areas
  • Kitchen Remodel Cost
  • North Shore
  • Blog
  • Contact Us

Contact

Phone(312) 544-9150
Headquarters205 N Michigan Ave, Suite 810
Chicago, IL 60601
Lincoln Park Studio2315 N Southport Ave
Chicago, IL 60614

Mon–Fri 9–6 · Sat 10–4

Chicago Neighborhoods

Lincoln Park · Gold Coast · River North · Lakeview · Wicker Park · West Loop · Bucktown · Logan Square · + more →

North Shore

Winnetka · Lake Forest · Highland Park · Evanston · Wilmette · Northbrook
Assembly Squad Remodeling LLC · All Rights Reserved ©2013–2026 · IL License #TGC098779 · A+ BBB · NARI Chicago
Privacy Policy Get a Free Estimate
  • Home
  • About Us
  • Services
  • GET FREE ESTIMATE
  • Portfolio
  • Service Area
  • Blog