
A Bucktown bathroom remodel at 2222 W Armitage, in design
In design
Updated 2026-11-02. This page is updated as the job moves; the design images will be joined by real photos as the work happens, and the finished rooms at completion.
A bathroom designed around one confident color
Most remodels stay safe. This owner walked into our Lincoln Park studio and asked for burgundy, and Gabriella took that seriously. Her design puts a deep red marble on the vanity and in a checkerboard across the floor, a fluted wood cabinet under it, a tree-pattern wallpaper above, and warm brass and alabaster light against all of it. It reads like a room someone designed, not a room someone renovated. It is the kind of work behind our Bucktown bathroom remodeling and Bucktown condo remodeling pages, and our wider Chicago condo remodeling work.
Two sinks, two mirrors, and storage that does real work
The existing wall had a long maple vanity, one wide mirror and a four-globe light bar. The design composes it as a pair: two rounded brass-framed mirrors, one over each sink, with alabaster sconces between and beside them. Below sits a floating fluted cabinet with deep drawers, topped in red marble with two round stone vessel sinks. Final sinks and faucets get confirmed at sign-off, since the plumbing stays where it is today.

Why does this shower go back to the studs?
Because tile is only as good as what is behind it. New tile over an old pan looks fine for a year and fails where you cannot see it. Here the walls come back to the studs for new cement board, a new sloped pan and a waterproofing membrane on the pan, the walls and every transition before any tile is set. The design carries large stone-look tile to the ceiling, a long recessed niche and a checkerboard marble floor. The frameless glass gets measured only after the tile is finished, because new tile moves every dimension by a few millimeters.

What keeps a bathroom like this affordable?
Nothing moves. The shower, both sinks and the toilet all reconnect in their existing positions, with no plumbing relocation and no structural work, so the budget goes into what you see and touch every morning. There is no tub in this room, by design: it is a true walk-in shower bath, with the space working for storage instead. Construction starts only when at least 80% of the materials have arrived, so once the crew begins, the job does not stop to wait for a delivery.
How does a remodel work in a Bucktown walk-up?
There is no freight elevator to book in a building like this, so everything goes up and down a shared stair. That means stair protection, a dust wall at the bathroom door, bagged debris carried out by hand and daily cleanup, because the neighbors use the same stair every day. We prepare the building paperwork, and licensed Chicago trades do the plumbing and electrical, with every connection pressure-tested before a wall closes.
What does a condo bathroom like this cost in Chicago?
This page doesn't publish this job's number. These are the ranges from our Chicago condo remodeling cost guide and condo bathroom cost guide:
- Condo bathroom: $15,000 to $45,000
- Full gut of a condo bath: $38,000 to $65,000
- Kitchen: $25,000 to $85,000
- Full condo renovation: $60,000 to $150,000 or more
Natural marble, custom vanities and walls taken back to the studs push a bathroom toward the top of its range.
What's included in this Bucktown bathroom remodel?
From the signed scope of work and the design direction in review. Items below describe the plan and can still change before sign-off.
Demolition
- Floors and stair protected, dust wall at the bathroom entry
- Glass, shower wall tile and substrate back to the studs; pan down to the subfloor
- Floor tile to substrate; vanity, top, sinks, faucets and linen tower out
- Toilet, mirror, lights, fan and accessories out; open drain covered
- Bagged debris carried down the shared stair, daily cleanup
Plumbing and Electrical
- Licensed Chicago plumber and electrician, no fixture moved
- New pressure-balanced shower valve, drain reset at the new pan
- New supply lines and full-port stops at both sinks and the toilet
- Sconces on a dimmer, quiet high-CFM exhaust fan, GFCI to current Chicago code
- Every connection pressure-tested before a wall closes
Shower
- New cement board and a new sloped pan
- Waterproofing membrane on the pan, walls and every transition
- Tile to the ceiling and an oversized recessed niche with a clean edge
- Mosaic or design floor over the new pan
- Frameless glass panel and door, measured after tile
Room and Vanity
- New floor tile wall to wall; new backsplash tile at the vanity wall
- New double vanity with drawer storage, top, two sinks and two faucets
- Two framed mirrors and flanking sconces
- New comfort-height toilet
- New accessories, moisture-resistant paint, caulk and seal
Handover
- Every selection made at the studio with samples in hand
- Construction scheduled once at least 80% of materials arrive
- 20-point inspection with run-water tests
- Final touch-ups and a deep clean
- 2-year workmanship warranty in writing
What should you know before remodeling a bathroom in Bucktown?
Can you use a dark color in a small Bucktown bathroom?
Yes, if the room is lit and layered for it. In this design the burgundy runs through marble, wood and wallpaper, and warm alabaster sconces and brass frames keep it from reading flat. A pale stone-look shower balances the room. We test it with samples in hand at the studio, so you see the colors together before anything is ordered.
Why not keep the old pan and just re-tile this Bucktown shower?
Because that is the cosmetic version. New tile over an old pan and old waterproofing looks fine for about a year, then fails behind the wall, where you cannot see it. Going back to the studs gives new cement board, a new pan and a new membrane, so the room is new all the way through. Anything found behind the walls is photographed and priced in writing first.
Is it a mistake to remove the tub from a Bucktown condo bathroom?
This room never had one, so there was nothing to lose. It is a true walk-in shower bath, and the space goes to storage instead. In a condo with more than one bathroom, a walk-in primary often makes sense, though we would talk through resale if it were your only tub. See our Bucktown bathroom remodeling page for how we plan these.
How long does a bathroom remodel take in a Bucktown walk-up?
Timing depends mostly on materials and the design phase. We hold the start until at least 80% of materials have arrived, so nothing stalls once the crew is in. Design happens in a focused session at our Lincoln Park studio. The walls, pan and flood test come first, then tile, and the frameless glass is measured last, after the tile is finished.
What does moving nothing save on a Bucktown bathroom?
Keeping the shower, sinks and toilet in place avoids new supply and drain runs and the risk of cutting into floors or shared lines in an older building. That budget can then go to the marble, the vanity and the glass you see every day. Our condo bathroom cost guide shows how a full gut compares across Chicago.
Do you handle building paperwork for a Bucktown condo bathroom?
Yes. We prepare the building paperwork and insurance certificates ourselves, and licensed Chicago trades handle the plumbing and electrical, with any City permit the work calls for handled under our license. In a small association there may be no manager, so we make the process simple for whoever signs off. More on Bucktown condo remodeling.
Remodeling a bathroom in Bucktown?
See our earlier Bucktown bathroom and the 1757 N Paulina kitchen too. Start with a private consultation at your home, at our Lincoln Park design studio, or online. We draw the room before anything is ordered and hold a fixed price.
Book a Consultation → Call (312) 544-91502222 W Armitage Ave · Bucktown · Chicago, IL 60647 · (312) 544-9150 · Condo remodeling Chicago