• Home
  • About Us
  • Services
  • GET FREE ESTIMATE
  • Portfolio
  • Service Area
  • Blog
Kitchen,Bath,Condo Remodeling In Chicago| Assembly Squad
  • Home
  • About Us
  • Services
  • GET FREE ESTIMATE
  • Portfolio
  • Service Area
  • Blog
Chicago condo kitchen and living room finished with HOA approval and city permits by Assembly Squad Remodeling
Condo Permission Guide · Chicago · 2026 Owner's Guide
Condo Guide · 2026 · HOA and City Permits

Do You Need Permission to Renovate a Condo in Chicago? Complete 2026 Guide

Yes. Most condo renovations in Chicago need approval from your condo association first, then the City. Here's who approves what, what you can actually change, how long it takes, and what it costs.

ForChicago condo owners & buyers
CoversHOA approval · city permits · walls · costs
FocusHigh-rises, vintage & mid-rise condos
Read time10 minutes
PublishedMarch 2026
Viktor Aharon, Founder and CEO of Assembly Squad Remodeling
Written by
Viktor Aharon
Founder & CEO, Assembly Squad Remodeling · City of Chicago General Contractor License TGC098779 · 13 years in Chicago design-build · 500+ completed projects · BBB A+ · Rated 4.9★ on Google
The Quick Answer · 2026

Do you need permission to renovate a Chicago condo?

Yes, for most remodels. Your condo association comes first, then the City of Chicago. Skipping either step can lead to stop-work orders, fines, forced restoration and problems when you sell.

  • Your board: building rules, insurance, hours and elevator access. 2–6 weeks
  • City Standard Plan Review: the usual route for a full remodel. About 7–9 weeks
  • Total before work starts on a full kitchen or bathroom. 3–4 months
  • Smaller nonstructural work can qualify for the City's faster Express Permit. Up to 2,000 sq ft
  • The most expensive mistake: starting demolition before the permits are issued.
Viktor Aharon, Founder & CEO, Assembly Squad Remodeling. 500+ Chicago projects since 2013. City of Chicago General Contractor License TGC098779. Lincoln Park Design Studio: 2315 N Southport Ave. (312) 544-9150.
The Approvals

Who has to approve your condo remodel?

Two groups, in order. Get the association's approval first. For an Express Permit in a condo unit, the City asks for a signed approval letter from the association. Our Chicago condo remodeling team handles both approvals on every project.

WhoWhat they reviewTimeline
Condo board or management companyBuilding rules, structural concerns, construction hours, contractor insurance, elevator access, security deposit2–6 weeks
Chicago Department of BuildingsCode compliance, electrical, plumbing, structural work, inspectionsExpress Permit for nonstructural work, or about 7–9 weeks for Standard Plan Review
Total before work startsBoth, for most full remodels3–4 months
The List

What requires permission in a Chicago condo?

These are typical answers. Your declaration and your building's rules decide. Before you pick a floor, read our condo flooring rules guide.

What you are changingYour boardCity permit
Paint or light fixturesUsually no. Some boards review any change.Usually no
New flooringUsually yes. Many buildings have sound rules.Sometimes
Kitchen, same layoutYesUsually yes. Nonstructural work can qualify for the Express Permit.
Moving plumbingYes. Risers and the unit below decide what can move.Yes. Plan on Standard Plan Review.
Removing a nonstructural wallYesYes, with drawings from an Illinois-licensed architect or structural engineer.
Removing a load-bearing wallYes. Many towers say no.Yes. Structural work is not eligible for the Express Permit.
Windows or exterior doorsYes. These are usually building property.Often
The Walls

What can you change inside a Chicago condo?

You can usually change what is inside your unit: kitchen, bathrooms, floors, cabinets and finishes. Structural walls, plumbing risers, shared vents and walls between units are generally controlled by the association. Your condo declaration decides what is yours. For wet rooms, see our Chicago condo bathroom remodeling guide.

Can you change it?Short answerWhat it takes
An interior wall that holds nothing upUsually yesNeeds board approval, a permit and drawings from an Illinois-licensed architect or structural engineer.
A load-bearing wall, beam or columnRarely simpleStructural work. It needs an engineer and Standard Plan Review, and in many towers the answer is no.
The wall between you and a neighborAlmost neverIt is usually shared with the building, and it carries sound and fire separation.
A wall hiding plumbing or ventsCheck firstThe wall can sometimes move, but the risers stay.
Moving a sink, toilet or showerSometimesIt depends on the distance to the riser and what sits below. Many buildings ban wet rooms over a neighbor's dry rooms.
Windows, exterior doors and balconiesBoard decidesThese are usually building property.
From a Real Job · Streeterville

A wall came out at 111 E Chestnut

This condo remodel combined a wall removal, a quartz kitchen and a bathroom gut in about 5.5 weeks of construction. See the project.

How do you know if a wall is structural?

You cannot tell by knocking on it or by how thick it looks. Read the declaration, then ask management for the building drawings. If those do not settle it, open a small test area with the board's OK, and have a licensed engineer confirm it before anything comes down.

Condo vs. townhome

In a condo, the association usually controls structure, risers and common areas. In a townhome you often control more of the structure, but shared walls, roofs and exteriors can still need permission. See Chicago townhouse remodeling.

The Process

The approval process, step by step

Every condo job goes through the same six steps. The City's separate Preparatory Demolition permit comes only after a plan-based application is filed through Standard Plan Review.

  1. 1
    Read your declaration and bylawsLook for approval procedures, construction hours, insurance limits, flooring rules and anything prohibited.
  2. 2
    Submit your HOA applicationSend it 4 to 6 weeks before your planned start, with drawings, licensing and insurance certificates, a timeline, material specifications, and noise and hallway protection plans.
  3. 3
    Get approval in writingCommon conditions include limited work hours, service elevator reservations, hallway protection and a refundable security deposit. Verbal approvals are hard to enforce.
  4. 4
    Apply for your city permitFull remodels usually go through Standard Plan Review, about 7 to 9 weeks. Nonstructural interior work up to 2,000 square feet can qualify for the Express Permit Program. Structural work is not eligible.
  5. 5
    Pass your inspectionsExpect electrical and plumbing rough-in, framing if applicable, and a final inspection. Work cannot move past a stage until it passes.
  6. 6
    Keep your recordsSave approval letters, permit applications and final inspection records. Buyers' attorneys ask for them at closing.
The Money

What does condo permission cost in 2026?

Budget this separately from the renovation. These are typical ranges, and your building may differ. For the construction budget itself, see how much a condo remodel costs in Chicago.

Cost2026 rangeNotes
HOA application fee$100–$500One-time, non-refundable
Security deposit$500–$3,000Refundable after inspection
Elevator reservation$100–$300/dayRequired for material delivery
Management supervision fee$500–$1,500Charged by some luxury buildings
Common area protection$200–$500Hallway masonite, elevator pads
Standard Plan Review permit$1,200–$2,500Primary city permit for full reno
Electrical permit$300–$800Required for panel/wiring work
Plumbing permit$200–$600Required for any plumbing moves
City inspections$150–$300 eachMultiple required; rough-in + final
Total permission costs$3,500–$10,000Budget this separately from renovation
Your Building

How your building type changes things

Downtown high-rises in the Loop, River North and Streeterville tend to be the strictest. Expect service elevator reservations, deposits of $1,500 to $3,000, tighter noise rules and, in some buildings, union labor or background checks.

Vintage buildings in Lincoln Park, Lakeview and the Gold Coast bring older walls, limited electrical capacity and plumbing stacks that restrict your options. Pre-1978 buildings need lead-safe work, and asbestos should be checked before demo. Landmark districts can add a review for exterior changes.

Mid-rise buildings are usually the most flexible, with work hours around 8am to 5pm on weekdays and deposits of $500 to $1,500.

Recent Assembly Squad condo remodels in Chicago buildings:

Chicago condo renovation at 111 E Chestnut, Streeterville: open kitchen with white cabinets and a quartz peninsula after a wall removal
111 E Chestnut, Streeterville. Open kitchen after a wall removal.
High-rise condo bathroom remodel at 680 N Lake Shore Dr: teal walk-in shower with marble hex floor
680 N Lake Shore Dr, Streeterville. High-rise bathroom remodel.
Two-tone condo kitchen with a large island at 1001 W Madison, West Loop
1001 W Madison, West Loop. Condo kitchen remodel.
The Risk

What happens if you sell with unpermitted work?

Buyers' attorneys in Chicago routinely ask for permit history. Missing permits can scare off a buyer, cause loan problems, hold up closing, or lead to credits that cost more than doing it right. Illinois sellers also have disclosure duties, so talk to a real estate attorney before listing.

Keep Reading · The Chicago Condo Series
  • The PermitsCondo Remodeling Permits in Chicago: the permit programs in detail.
  • The CostsChicago Condo Remodeling Cost 2026: what a condo renovation costs, room by room.
  • The FloorsChicago Condo Flooring Rules: the IIC and STC ratings your board requires.
  • The BuildingHigh-Rise Condo Remodeling in Chicago: elevators, work hours and building rules.
  • The ContractorHow to Choose a Condo Remodeling Contractor: the questions to ask before you hire.
  • The TownhomeTownhouse Remodeling Chicago: what changes outside a condo building.
Common Questions

Chicago condo renovation permission FAQ

Can you knock down walls in a condo?

Often yes for an interior wall that holds nothing up, with board approval, a permit and drawings from an Illinois-licensed architect or structural engineer. Load-bearing walls and walls between units are far harder, and many buildings say no. Confirm what a wall does before planning around it.

Can I renovate my condo if I own it?

Yes, within your declaration and building rules. You can usually change what is inside your unit, but structure, risers and common areas are generally controlled by the association, and most remodels need board approval and a city permit.

How do I know if a condo wall is structural?

Start with your declaration and the building drawings from management. If they do not settle it, open a small test area with the board's approval, and have a licensed engineer confirm it before any wall comes down.

What is the difference between a condo and a townhome remodel?

In a condo, the association usually controls structure, risers and common areas, and the board reviews your work. In a townhome you often control more of the structure, but shared walls, roofs and exteriors can still need permission.

Do I need HOA approval for painting my Chicago condo?

Interior wall painting typically doesn't require HOA approval unless it's visible from common areas. However, painting exterior-facing trim or your front door usually requires approval to maintain building uniformity. Check your building's declaration, because some strict HOAs require approval for any interior changes. When in doubt, ask management in writing rather than assume it's allowed.

How long does HOA approval take for Chicago condo renovations?

Most Chicago condo boards take 2–6 weeks to process renovation applications. Luxury high-rises often take 4–8 weeks. Most boards meet monthly, so if you miss the submission window, you wait for the next meeting. Submit complete applications with all documentation to avoid delays. Assembly Squad tracks board meeting schedules and submits at the right time for every project.

Can I start demolition while waiting for city permits in Chicago?

No. Do not begin demolition or construction until HOA approval and your city permit are in hand. Starting without permits can lead to stop-work orders, fines and restoration of completed work. The City has a separate Preparatory Demolition permit, available only after a plan-based application is filed. Some contractors suggest starting "prep work" while permits are pending, which is a serious risk. The correct sequence is HOA approval, then city permit, then construction.

What documents do I need for Chicago condo renovation approval?

For HOA approval: detailed renovation plans, contractor licensing and insurance certificates ($1–2M general liability), project timeline, material specifications, noise mitigation plan, and hallway protection details. For city permits: architectural drawings (engineer-stamped if structural), contractor licensing, electrical and plumbing plans if applicable, and your HOA approval letter. Having complete documentation from day one prevents delays from both entities.

Can my HOA deny my renovation request in Chicago?

Yes, but only for valid reasons based on building rules, safety concerns, or aesthetic standards. Valid denial reasons include structural concerns, aesthetic guideline violations, incomplete applications, or insurance issues. If denied, request specific written reasons. You can modify your plans to address concerns and resubmit. In cases where denial seems unreasonable or arbitrary, consult a Chicago condo law attorney.

Do I need an architect for Chicago condo renovation permits?

Not always. Structural modifications (wall removal, beam installation), projects over certain square footage thresholds, and historic buildings typically require architect-stamped drawings. Kitchen and bathroom renovations without structural changes, flooring replacements, and electrical/plumbing updates within existing layouts often do not. Our design team prepares the permit drawings, and we bring in a licensed structural engineer when the work requires one.

What happens if I sell my Chicago condo with unpermitted renovations?

Unpermitted renovations can derail a Chicago condo sale. Buyers' attorneys routinely request permit history during due diligence. Missing permits trigger attorney review issues, lender financing problems, required permits after the fact, and forced price reductions. Illinois sellers have disclosure duties, so if you've done unpermitted work, talk to a real estate attorney before listing.

What are typical HOA fees for Chicago condo renovations in 2026?

Application fees run $100–$500 (non-refundable). Security deposits range $500–$3,000 (refundable). Elevator reservations cost $100–$300/day. Some buildings charge management supervision fees of $500–$1,500. Budget $1,500–$5,000 total for all HOA-related fees on top of your renovation and city permit costs. Get a complete fee schedule from building management before you begin the approval process.

Your Condo

Not sure what your building requires?

We read your declaration, prepare the HOA package, track board meetings, file the city permits and schedule the inspections. Tell us your building and we'll tell you what you're facing.

Get a Free Estimate →Call (312) 544-9150
Assembly Squad Remodeling · City of Chicago General Contractor License TGC098779 · EPA Lead-Safe Certified · BBB A+
Lincoln Park Design Studio: 2315 N Southport Ave (Mon–Fri 9am–6pm · Sat 10am–4pm) · HQ: 205 N Michigan Ave, Suite 810 · (312) 544-9150
This guide explains how condo approvals generally work in Chicago. It is not legal advice. Your declaration and building rules control, so confirm details with your association.
Assembly Squad
Remodeling

Chicago's boutique design-build remodeling company since 2013. Kitchen, bathroom, condo, basement, and whole-home renovations across Chicago and the North Shore.

IL #TGC098779
A+ BBB
NARI Chicago
NKBA Member
EPA Lead-Safe
$2M Insured
★ 4.9 on Google · Read our reviews

Services

  • Kitchen Remodeling
  • Bathroom Remodeling
  • Condo Remodeling
  • Basement Remodeling
  • Whole House Remodeling
  • Attic Conversions
  • Custom Cabinets
  • Design-Build Studio

Explore

  • About Us
  • All Services
  • Project Portfolio
  • Service Areas
  • Kitchen Remodel Cost
  • North Shore
  • Blog
  • Contact Us

Contact

Phone(312) 544-9150
Headquarters205 N Michigan Ave, Suite 810
Chicago, IL 60601
Lincoln Park Studio2315 N Southport Ave
Chicago, IL 60614

Mon–Fri 9–6 · Sat 10–4

Chicago Neighborhoods

Lincoln Park · Gold Coast · River North · Lakeview · Wicker Park · West Loop · Bucktown · Logan Square · + more →

North Shore

Winnetka · Lake Forest · Highland Park · Evanston · Wilmette · Northbrook
Assembly Squad Remodeling LLC · All Rights Reserved ©2013–2026 · IL License #TGC098779 · A+ BBB · NARI Chicago
Privacy Policy Get a Free Estimate
  • Home
  • About Us
  • Services
  • GET FREE ESTIMATE
  • Portfolio
  • Service Area
  • Blog